Client Information

Client:
Narrabri Shire Council
Duration:
April 2024 — September 2024
Value:
$5M
Location:
Wee Waa, NSW
Contact Us

Project Summary:

The WUC are part of a multi-stage freight route upgrade of the roads connecting Yarrie Lake Road with Pilliga Road via Prices Lane, Sandy Hook Lane and Womera Creek Road. The current road is a typical rural gravel road construction with approximately 7m formation with a thin gravel pavement and expansive clay subgrade. Each stage of the project will upgrade the existing gravel road to a 9m wide lime stabilised formation and crushed rock pavement with a 7m wide seal.

Project Scope:

● Part of a multi-stage upgrade to improve freight routes connecting Yarrie Lake Road and Pilliga Road.

● Upgrading the existing 7m wide rural gravel road with expansive clay subgrade.

● The road will be upgraded to a 9m wide lime-stabilised formation with a crushed rock pavement.

● The final surface will feature a 9m wide sealed road, pavement line marking to support improved freight movement and durability.

● Revegetation to include topsoil and Hydroseed.

Key Challenges:

● Traffic Management in closing the road and directing traffic to alternate routes during construction.

● Constructing new culverts and drainage structures while maintaining existing water flow and preventing flooding.

● Coordinating the construction of pavements and sealing works.

Key Success Factors:

● Maintaining clear and consistent communication with all stakeholders, including the Principal, subcontractors, and the community.

● Adherence to high standards in demolition, earthworks, subgrade stabilisation, drainage, and pavement construction.

● Ensuring smooth and safe traffic flow throughout the project duration.

● Meeting project deadlines within the 24-week contract period.