Bathers Way South

March 2017 - November 2017

Client Information

Newcastle City Council

  • Duration: March 2017 - November 2017
  • Value: $10M
  • Location: Newcastle, NSW

Scope of Work

  • Preparation, implementation and management of environmental, safety and traffic management plans for the works

  • Establishment and disestablishment of site

  • Demolition of existing infrastructure elements as outlined in the drawings

  • Relocation of 11kV Ausgrid high voltage cables

  • Construction of concrete pathways, stairs and retaining walls including preparation of existing surfaces, dowelling, formwork, reinforcement, supply and placing of concrete, curing, finishing, and associated ancillary works

  • Removal of existing vegetation and replacement as required

  • Reconstruction and refurbishment of road pavement

  • Installation of electrical services / lighting

  • Upgrade of storm water drainage including construction of kerb and gutters

  • Provision of work as executed drawings, maintenance manuals and the like

  • Completion of all landscaped areas

Significant Achievements

  • Works in close proximity to Newcastle Beach; high levels of environmental protection etc

  • Works within a densely populated area; high level of interaction with residents, pedestrian traffic and vehicular traffic

  • The project will require completion within a tight period due to a major event scheduled for November 2017 (Newcastle 500 Supercars Race)